the axis of the earth's magnetic field should be aligned the directional axis of the plot should be properly.
Boundaries AC & BD should be parallel to a north-south axis.
While boundaries AB & CD should be in an East-West alignment. such land will remain averse to overall growth, peace & happiness of those that shall inhabit it.
Shape of the land is very important
Symmetrical shapes like square or rectangular, circular & hexagonal promote overall growth, increases mental capabilities and generates prosperity.
Asymmetrical shapes like oval, triangular, parallelogram, star & trident are deemed inauspicious.
Tuesday, March 31, 2009
Wednesday, March 18, 2009
supervisor and worker best ratio
Factors that help determine the optimum worker-to-supervisor ratio:
• Supervision across multiple shifts
• Physical location of work locations
• Mix of trades
• Level of experience and tenure with the company
• Supervisor’s capability and experience
• Organizational structure
• Specialty crewing
• Distribution of supervisory functions
• Supervision across multiple shifts
• Physical location of work locations
• Mix of trades
• Level of experience and tenure with the company
• Supervisor’s capability and experience
• Organizational structure
• Specialty crewing
• Distribution of supervisory functions
APPC Distance education courses
Andhra Pradesh Productivity Council
Productivity house, plot No 87, Opp: Natco house, Road No. 2, Banjara Hills, Hyderabad
500033
Ph:040 23545232, 040 235452827 (Fax)
Announces admission to the following PG Diploma/Post Diploma/Diploma courses through distance education
One year Post graduate diploma courses (Eligibility Any Graduate)
1. Personnel Management, Industrial Relations and Labour welfare
2. Financial Management and Taxation
3. Material Management
4. International Business
5. Marketing and sales management
6. Total Quality Management and ISO 9002
7. Import and Export Management
8. Human Resources Development
9. Travel and Tourism Management
10. Business administrative management (with Specializations)
I) Marketing, II). Finance, III). Human Resources
11. Hotel management and catering Technology
12. Industrial Engineering and management
13. Safety management and Good Housekeeping
14. Energy and environmental management
1, 2, 3, 5, 6 12 are accepted as additional qualification by employment exchange of Andhra pradesh.
12, 13 courses eligibility is Degree in engineering
1 Year Post diploma courses (Eligibility any Diploma in Engineering with 2 years experience)
1. Materials Management
2. Business administrative management
3. Total quality management
4. Industrial Engineering and Management
5. Safety management and Good Housekeeping
6 Months Diploma Courses
1. Media planning and advertising Graduate
2. Foreign trade Graduate
3. Customer relationship management Inter
4. Office administration management Inter
Productivity house, plot No 87, Opp: Natco house, Road No. 2, Banjara Hills, Hyderabad
500033
Ph:040 23545232, 040 235452827 (Fax)
Announces admission to the following PG Diploma/Post Diploma/Diploma courses through distance education
One year Post graduate diploma courses (Eligibility Any Graduate)
1. Personnel Management, Industrial Relations and Labour welfare
2. Financial Management and Taxation
3. Material Management
4. International Business
5. Marketing and sales management
6. Total Quality Management and ISO 9002
7. Import and Export Management
8. Human Resources Development
9. Travel and Tourism Management
10. Business administrative management (with Specializations)
I) Marketing, II). Finance, III). Human Resources
11. Hotel management and catering Technology
12. Industrial Engineering and management
13. Safety management and Good Housekeeping
14. Energy and environmental management
1, 2, 3, 5, 6 12 are accepted as additional qualification by employment exchange of Andhra pradesh.
12, 13 courses eligibility is Degree in engineering
1 Year Post diploma courses (Eligibility any Diploma in Engineering with 2 years experience)
1. Materials Management
2. Business administrative management
3. Total quality management
4. Industrial Engineering and Management
5. Safety management and Good Housekeeping
6 Months Diploma Courses
1. Media planning and advertising Graduate
2. Foreign trade Graduate
3. Customer relationship management Inter
4. Office administration management Inter
Monday, March 2, 2009
Design of group work/ line production in production
Design of group work/ line production in production
where does group work fit in seven production system models
these are mainly schematically divided production systems
1. Machine faced line
2. Man paced line
3. Automated process
4. Concentrated operation
5. Diversified line group
6. Service group
7. Construction group
Machine faced line
It is predominately based on material handling important factor. The best example is final assembly line of car assembly on a fixed- speed assembly line
The advantages are short throught put times, the efficient utilization space, machines and auxiliary equipment, efficient operation that is achieved through the extreme division of work and specialization
Disadvantages are extreme sensitive to disturbances, only as strong as their weakest link, more difficult to make changes
Man paced line
If we remove the mechanized control and flow speed from the production line is called as man-paced production line. The control is less rigorous and existence of buffer stocks makes it possible to adapt individual work pace in a completely different way. A group made up of individual work roles, operatives can help each other, take care of work disturbances, event out peaks and valleys of work flows and strive for common work results
where does group work fit in seven production system models
these are mainly schematically divided production systems
1. Machine faced line
2. Man paced line
3. Automated process
4. Concentrated operation
5. Diversified line group
6. Service group
7. Construction group
Machine faced line
It is predominately based on material handling important factor. The best example is final assembly line of car assembly on a fixed- speed assembly line
The advantages are short throught put times, the efficient utilization space, machines and auxiliary equipment, efficient operation that is achieved through the extreme division of work and specialization
Disadvantages are extreme sensitive to disturbances, only as strong as their weakest link, more difficult to make changes
Man paced line
If we remove the mechanized control and flow speed from the production line is called as man-paced production line. The control is less rigorous and existence of buffer stocks makes it possible to adapt individual work pace in a completely different way. A group made up of individual work roles, operatives can help each other, take care of work disturbances, event out peaks and valleys of work flows and strive for common work results
Labels:
machine faced,
man faced,
seven production system
MADE IN JAPAN
MADE IN JAPAN Written by AKIO MORITA and sony
It is a good book to know the capacity and capability of a person and organization
It explained with so many examples and real situations
It is a good book to know the capacity and capability of a person and organization
It explained with so many examples and real situations
Subscribe to:
Comments (Atom)
geminine saying
live like a legend....